Beach Kiosks
In 2012, we worked with Nick Henley on an exciting project along the Weymouth esplanade, where wedeveloped a strategy for the sustainable use of beach kiosks.
The project aimed to solve several significant challenges, including the need for the kiosks to be easily removed during extreme flooding events, as well as addressing seasonal issues such as overheating in summer and dampness in winter. Our design focused on providing long-term functionality, while ensuring the kiosks could withstand the harsh coastal environment and changing weather conditions throughout the year.
A key innovation in the design was the "keel" shape of the kiosks, which incorporated ventilation at both ends to promote passive airflow. This design feature allowed natural air circulation through the structure, helping to prevent overheating in the warmer months and reduce humidity during winter. Additionally, the kiosks were equipped with hatches at the front and back, allowing for a sheltered servery area during the winter, ensuring the kiosks remained adaptable to varying weather conditions. To further support sustainability, the kiosks were built on foundations made from Greenheart piles, recycled from Portland Harbour. These piles are also recyclable, contributing to the project's overall environmental goals.
The kiosk shell was constructed using traditional timber strakes, providing both aesthetic appeal and structural stability. The exterior was then covered with a bronze/GRP composite material, which was chosen for its durability and minimal maintenance requirements in the exposed coastal location. Inside, high-build varnish was applied to enhance the timber’s resilience. The kiosks were modular, factory-fabricated by a local boat builder, ensuring high precision and quality, and were craned into place in two halves, which were then assembled on-site. Unlike traditional beach kiosks, which often require yearly refurbishments, our design incorporated flexibility within the internal layout, reducing the need for frequent alterations or rebuilds. This approach not only ensured adaptability but also helped keep operational costs low throughout the kiosk’s lifespan.
Project roundup:
Client: Commercial Client
Location: Weymouth, UK
Project Team: Barlow Henley Architects & Fenton Holloway Engineers